23/07/2026
Recent ground floor WC renovation.
Full rip out
Full tile, Ceiling cladded, vinyl click floor.
New towel rad, new basin, bidet toilet, boxed in (with access to the filter and isolation on right hand side for easier maintenance).
Door trimmed. Fully sealed.
(Didn't get picture but pipe caps fitted on rad pipes and tiled and trimmed the rear sides of pedestal to hide piping.
Customer was over the moon 😃.