07/30/2026
The Grand Gardner Hotel. Final chapter. ✨
From the very first design sketch in January 2025 to the last drain tied in on the north side, this project has been one of the most ambitious, challenging, and rewarding builds our team has ever taken on. Here is a quick look at everything that went into making this space what it is today. 👇
Ryan and Dean share their final thoughts in this last video, and it is safe to say the feeling of seeing it all come together makes every long day, every curveball, and every problem solved completely worth it. 🙌
Ryan put it best. This project has been a long time coming. The design process alone started over a year before a single shovel hit the ground, and the build itself brought challenge after challenge. Grading issues, drainage engineering, custom railings, plant selection, and more. But watching it all come to life, seeing a space that was just lines on paper turn into something guests can actually sit in, enjoy a drink at, and experience, that is what it is all about. 🥂 This one means a lot. 💙
📍If you are in Valparaiso, go check out the Grand Gardner Hotel. Grab a drink, sit by the firepit, take it all in, and enjoy the space. It was built for exactly that. 🔥🌿
̇gn