03/06/2026
Attended site to carry out repairs to the existing drainage system.
The old Windsor trap was removed due to its condition and a patch repair was completed to the affected section of pipework. The trap and associated pipework were reinstated and secured correctly to ensure satisfactory drainage flow and operation.
All repairs were loop upon completion and found to be functioning correctly with no leaks present at the time of attendance