Out with the old, in with the new! 👷♂️🚧
Our engineers attended site to investigate a section of pipework that had previously been repaired incorrectly. After excavating down to the affected area, we identified a poorly joined section causing restrictions within the line.
The defective section was removed and replaced with new pipework, securely connected using Fernco couplings. Once the repair was complete, the pipe was surrounded with shingle for protection before being carefully backfilled.
To ensure everything was functioning correctly, we carried out a CCTV survey following the repair, confirming the line was flowing freely and the repair had been completed to a high standard. ✅