Recent works completed at Skylark Golf & Country Club ⛳We've been carrying out a range of improvement works to refresh t...
05/08/2026

Recent works completed at Skylark Golf & Country Club ⛳
We've been carrying out a range of improvement works to refresh the appearance of the exterior areas, including:

• Exterior decoration to enhance the overall finish.
• Repairs to external render
. installation of new exterior lighting.
• Construction of a new timber enclosure around the existing fridge, finished in durable black barn paint for a smart, modern look.

NHS -fleet workshop Following the successful handover of the new Fleet Workshop in Aylesbury, we have continued with the...
23/07/2026

NHS -fleet workshop

Following the successful handover of the new Fleet Workshop in Aylesbury, we have continued with the external infrastructure works to further enhance the site.

The works include:

Installation of 13 new ambulance charging gantries with Auto Safe units
New electrical supplies and a new mains distribution board
Installation of Armco barriers and vehicle wheel stops throughout the existing car park
These improvements will enable the fleet team to keep all ambulances fully charged while awaiting maintenance or once repair works have been completed, helping to maximise vehicle availability and operational efficiency.
Another great project delivered, supporting frontline emergency services with reliable, future-ready infrastructure.

18/07/2026

Good luck to all our supported racers and teams this weekend .
MasterMac Honda Daniel Brooks Racing

14/07/2026

Pharmacy/make ready project.
1of4 sites with 3 rooms on each site ,today we moved into the second room at Reading .

The full refurbishment of Didcot Ambulance Station is nearing completion.The toilets and shower rooms have been transfor...
29/06/2026

The full refurbishment of Didcot Ambulance Station is nearing completion.
The toilets and shower rooms have been transformed with new LED lighting, vinyl flooring, and fresh decoration throughout.
All previously tiled walls have been upgraded with hygienic wall cladding installed from floor to ceiling, creating a clean, modern finish.
New vanity units, sinks, and taps complete the refurbishment, giving the facilities a fresh,new look.

Great to see the first ambulance vehicles being worked on this week at our Aylesbury contract.The transformation has bee...
11/06/2026

Great to see the first ambulance vehicles being worked on this week at our Aylesbury contract.

The transformation has been remarkable. What started as an empty warehouse has now become a fully equipped, state-of-the-art vehicle workshop.

Phase 2 is progressing well and remains on track for completion in July.

Vision has worked closely with the South Central Fleet and Estates teams to deliver this project, and the collaboration throughout has been excellent.

A huge credit to everyone involved in making this project a success so far. We look forward to reaching the next milestone in the coming weeks and continuing to build on the progress achieved to date.

Pharmacy project -Today we started  at Reading  Ambulance station the first of 4  stations in phase 1 of the pharmacy up...
01/06/2026

Pharmacy project -
Today we started at Reading Ambulance station the first of 4 stations in phase 1 of the pharmacy upgrade project .
First part was to remove all the medication equipment into a temporary container to allow for the works to be carried out over the next few weeks.

Upgrading the pharmacy and make ready rooms on each site .
Including -
New vynl flooring
Air conditioning to temperature control the rooms for the storage of medicine .
Anti bacterial paint to all walls
New hygenic doors
Bespoke storage cabinets for the storage and distribution of medical supplies into the Ambulances .
Data and electrical works.

HART-NHS  - Hazardous area response team .Vision Ecs have been at HART this week carrying on with the trust wide chargin...
21/05/2026

HART-NHS - Hazardous area response team .
Vision Ecs have been at HART this week carrying on with the trust wide charging works .
Removing the existing 110v transformers and charging leads and installing new mains cabling ,auto safe units and the new hanging lead configuration.

Spectrum 1600 -Big task last week removing the exsiting generator that served the original tenant .The generator was dis...
18/05/2026

Spectrum 1600 -
Big task last week removing the exsiting generator that served the original tenant .
The generator was disconnected from the electrical mains and change over switch .
We also removed the fuel tank and flu through the roof .
The building will now be converted into a bike shelter for the new tenants across 3 floors .

Basingstoke Ambulance Station.A successful couple of weeks completing the asbestos removal around the perimeter of the b...
10/05/2026

Basingstoke Ambulance Station.
A successful couple of weeks completing the asbestos removal around the perimeter of the building. Carrying out works within a live ambulance station is always challenging — even more so when asbestos removal is involved.
The contents of the rooms were cleared in carefully planned stages, allowing the works to progress while still enabling the station and team leaders to continue operating effectively throughout.
This week, the installation of the new windows and doors is underway.