04/08/2026
Before launching TS Ace of Trades, I worked on a range of large-scale construction projects, including this project at ASDA in West Swindon.
It involved the survey, design, manufacture and installation of new structural steelwork, cladding supports and signage.
The work began with a detailed survey of the existing building and steel structure. From this, CAD layouts, setting-out drawings, connection details and fabrication drawings were produced before the galvanised steelwork was manufactured.
As the store and shopping centre remained operational, the work had to be carefully planned around a live public environment. Safe working zones were established, existing cladding and signage were removed, and the new steelwork was installed using a telehandler, cherry pickers and scissor lifts.
Once the structure was lined, levelled and secured, the new cladding and ASDA signage were installed to complete the updated corner of the building.
Projects like this taught me the importance of accurate surveying, careful planning and understanding how every part of a building connects.
That same approach now sits behind TS Ace of Trades. We look beyond the visible issue to find the right long-term solution.
Whether you're planning a property enhancement, structural alteration, steelwork installation or ongoing maintenance, we'd love to discuss your project.
Get in touch: https://www.tsaceoftrades.co.uk/contact-us/