04/06/2026
Groundwork done right before the concrete pour! π·ββοΈπ§
A successful slab starts long before the concrete arrives. On this project, our team completed all the underground plumbing infrastructure to ensure everything is perfectly positioned and protected before the slab is cast.
β
Installed all waste pipework and drainage lines
β
Positioned and secured all plumbing sleeves through foundations and slab areas
β
Installed hot and cold water supply sleeves
β
All the sleeves is ready for the manifold system
β
Set out all pipe penetrations according to the approved plans
β
Checked levels, falls, and alignment of all drainage lines
β
Inspected pipework before backfilling
β
Prepared all services for a smooth and trouble-free concrete pour
Attention to detail at this stage is critical, as everything beneath the slab must be 100% correct before the concrete is placed. Proud of the teamβs workmanship and commitment to getting the foundations right from the start.