07/08/2024
It took 4 different companies to do this job.
The "Before" was done by 3 different companies. Company 1 - supplied tub, Company 2 - built pump station and Company 3 did the so-called decking.
The "After" was done by us (Company 4).
We broke down everything, removed paving to level the tub, because the tub was not level at all and re-built the decking enclosure.