06/23/2026
We recently completed the rough plumbing for a new basement bathroom in Covington.
While the home already had a builder-installed rough-in, additional drain, waste, vent, and water piping was needed to support the homeowner's planned layout and utility sink.
DBS pulled the required permit, completed the rough-in work, and coordinated inspections to keep the project moving forward.
This phase may not be the most visible part of the project, but it's the foundation that everything else will be built on.