10/10/2026
PART 2: From paper to ground ✅
After the lot evaluation comes the step nobody sees: the design goes to the Florida Department of Health for approval. They approve it… or they don’t. No approval, no install.
Once it’s APPROVED, we break ground: excavation, the septic tank set in place, distribution box, and the drain field — with the ATU system installed exactly as designed.
That’s the difference between guessing and doing it by the code.
ONE HOME. ONE CALL. XQS.
📞 (813) 843-0200
• Florida PlumbingLife •