J & J Clearing & Demolition Inc.

J & J Clearing & Demolition Inc. J & J Clearing & Demolition Inc., conveniently located in Suffolk, VA, serves homeowners, businesses and contractors with all of their demolition needs.

When you want reliable, reputable and affordable demolition, contact J & J Clearing & Demolition Inc. We have the skills to demolish a wide variety of buildings and structures. Complete or partial demolition of residential structures including houses, garages, driveways, in-ground pools, septic tanks and tree removal. Complete or partial demolition of commercial structures such as gas stations, re

staurants, apartments and strip malls. Complete removal of any structures such as parking lots, storm-drain systems or sanitary sewer systems. Installation of erosion-control measures. Clearing ?We specialize in custom lot clearing for new house sites, leaving selected trees and trimming up remaining trees.

07/26/2018

If it is time to change your docking area, do not leave old pilings in place to create a boating hazard. Have old pilings removed before installing new ones. The process is simple, and the same equipment is used for both processes.

07/24/2018

Pile driving and pile digging rigs are used in deep foundation work, and because of their design, are very effective and reliable. In fact, one of the main benefits of pile driving and rigging is that this is reliable under any condition. And because the process is so efficient, it is highly cost effective.

07/19/2018

The hydraulic hammer is a new-age pile driver that replaces the diesel hammer. This device is more environmentally friendly and creates slightly less noise. Although, the diesel is still more reliable and more familiar in the construction world.

07/17/2018

Demand for prestressed concrete piles is on the rise. Why? The prestress casting process increases strength, makes them easier to handle and reduces the need for additional reinforcement when the pile is put into place.

07/12/2018

Pile drivers have existed for a very long time and even the Roman Empire used them. In fact, it is said that the construction of the Caesar's Rhine Bridges in Rome, which date all the way back to 55 BC, were constructed using ancient pile drivers.

07/10/2018

One recent innovation in pile driving technology is the development of press-in equipment that uses hydraulic fluids to provide force. In this method, often used if vibration is an issue, piles are essentially pushed into place. The process can also be reversed for extraction.

07/05/2018

What is the difference between deconstruction and demolition? Deconstruction employs techniques which carefully take a building apart to preserve its interior and exterior structures whereas demolition levels and removes a building and demolition debris without these considerations.

07/05/2018

When piles needed to be driven deeper than what people hammering blows could deliver, cranes were erected, and pulleys used as groups of workers or animals lifted huge weights, which were then dropped on the pile to drive it. With the invention of the steam engine, piles could be driven faster and to deeper depths.

07/03/2018

Did you know that professional demolition services can be used for small residential jobs too? Whether you need a swimming pool removed or a driveway demolished and hauled away, residential demolition services will ensure the job is done right.

07/03/2018

The historical city of Venice is actually 117 different islands, but you wouldn't know it by walking around. That's because thick piles were driven into the soft mud and clay to support building stone buildings and bridges over the 177 canals.

06/28/2018

Remember, office buildings are not immune to the fines for failing to obtain demolition permits. Not only can we handle all your demolition needs, but we can advise you on what permits your business will need to avoid penalty.

06/28/2018

Vibratory pile drivers are powered using hydraulic motors and use counter-rotating weights to cancel out horizontal vibration so that vertical vibration can be used more effectively. The pile driver is lifted and positioned directly over the pile using a crane and is fastened by clamp or bolts, allowing for extraction or piling.

Address

5476 Nansemond Pkwy
Suffolk, VA
23435

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 5pm
Sunday 12am - 11:59pm

Telephone

(757) 488-5032

Alerts

Be the first to know and let us send you an email when J & J Clearing & Demolition Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to J & J Clearing & Demolition Inc.:

Share