07/24/2026
đź’§ 500 Feet Down, Built to Last! đź’§
This project took us 500 feet underground to completely upgrade this deep well system.
The original installation used PVC drop pipe with galvanized fittings, and those galvanized fittings had begun to fail. Rather than simply replacing the damaged components, we upgraded the entire system to high-quality polyethylene pipe, eliminating the weak points and providing a much more durable, long-lasting installation.
But we didn’t stop there.
To help protect the system from excessive water hammer and reduce stress on the drop pipe, we installed additional inline check valves every 200 feet, along with an external check valve directly above the pump, complementing the pump’s factory-installed internal check valve. These extra measures help support the water column in a deep well and reduce the load placed on the system during operation.
When you’re working with 500 feet of pipe and pump, attention to detail matters. We believe in doing the job right the first time—not just fixing today’s problem, but helping prevent tomorrow’s.
If your well system is aging, losing pressure, or you’re experiencing intermittent water issues, give us a call. Whether it’s 50 feet or 500 feet, we’ve got the equipment and experience to handle it.
📞 Magnus Mechanical Well, Grinder & Septic Service
✔️ Well Pumps
✔️ Pressure Systems
✔️ Deep Well Installations
✔️ Emergency Service
Reputation… is everything.