10/26/2026
Sunday night under the lights last night on Route 9 Shrewsbury at the former Perrone’s Barbershop doing a sewer disconnect, water disconnect, and a new 1 1/2” water service tap for the future build Chase Bank. Huge thanks to A J Belculfine for the Vac Truck service, Hydra Tech for the new 1 1/2” tap, and Dauphinais Concrete. All done in one night with flowable fill backfill. Final road patch and temp sidewalk patch to be completed tonight