Southwest golf ranch small flow septic system.58,000 lbs of concrete tanks in the ground.5000 gallon dose tank pumping t...
12/06/2025

Southwest golf ranch small flow septic system.

58,000 lbs of concrete tanks in the ground.

5000 gallon dose tank pumping to an ATL bed and existing mound.

8” sanitary sewer main extension with total site restoration.
12/05/2025

8” sanitary sewer main extension with total site restoration.

Tadmor sluice gate rehabilitation project.Tadmor was a small town near Vandalia Ohio, which was destroyed in the great f...
07/24/2025

Tadmor sluice gate rehabilitation project.

Tadmor was a small town near Vandalia Ohio, which was destroyed in the great flood of 1913. There are small remnants left behind to this day near our project site within the Taylorsville metro park.

The sluice gate from this project once controlled the flow of the Erie Canal, once the Taylorsville dam was created - the sluice gate was no longer in use and became a part of history.

Our goal for this project was to regain access to the “buckeye trail” within the park, which has been blocked for over 10 years.

We installed a 42” x 25’ galvanized culvert, situated with a 6’ x 12’ concrete wall.

We were required to divert water for 1 week within the creek.

Being hundreds of feet off the bike path, pouring concrete and creating access for equipment was a difficulty.

What a great project completed for the City of Oxford. 2 goals in mind for this project• Create a flushing point • Reduc...
06/26/2025

What a great project completed for the City of Oxford.

2 goals in mind for this project
• Create a flushing point
• Reduce iron content due to a tee from well #5.

We pre fabricated a 24” ductile stick fitted with a wye, tee and butterfly valve. This stick weighed nearly 7,000 lbs.

With an 8 hour shutdown, our timing was critical to cut and remove the existing, and set our pre fabricated stick.

We finished at 7 hours and 50 mins, im very proud of what we accomplished.

25’ sewer action for our recent site development.
06/25/2025

25’ sewer action for our recent site development.

Hanover park septic installation • Jet tank with aerator / compressor • Dose tank with UV / champion pump to ATL bed
03/19/2025

Hanover park septic installation

• Jet tank with aerator / compressor
• Dose tank with UV / champion pump to ATL bed

Millville water main reroute•360’ 6” ductile iron • 50’ 12” road bore underneath route 27
03/19/2025

Millville water main reroute

•360’ 6” ductile iron
• 50’ 12” road bore underneath route 27

Knocking out our soil absorption projects before the end of year! Here is the ATL bed install at Hanover park. Due to cu...
11/14/2024

Knocking out our soil absorption projects before the end of year!

Here is the ATL bed install at Hanover park.

Due to current construction on site, we will be back in December to set our tanks and finish the project.

New construction septic install.2000 gallon concrete septic tank 24” chambers Water line installation We cleared all bru...
10/10/2024

New construction septic install.

2000 gallon concrete septic tank

24” chambers

Water line installation

We cleared all brush / trees required and hauled off site

Moundview park septic install.•Septic tank•Dosing tank•perimeter drain sump•Sand mound •Inlet to house and park restroom...
10/07/2024

Moundview park septic install.

•Septic tank
•Dosing tank
•perimeter drain sump
•Sand mound
•Inlet to house and park restroom building
•Complete restore including asphalt and seed / straw

What a pleasure it was to be apart of this project.

Layhigh road septic install.Jet 500 GPD tank with aerator and UV disinfection.3 150’ leach lines totaling 450’ using 22x...
07/31/2024

Layhigh road septic install.

Jet 500 GPD tank with aerator and UV disinfection.

3 150’ leach lines totaling 450’ using 22x8” LP chambers.

Interceptor / gradient drain surrounding the leach bed.

4” of topsoil will be graded around the tank when the build is complete.