05/14/2026
Today, we assisted some contractors we collaborate with on a basement finishing project. We relocated the softener tank to make way for the new walls they’re framing. During the repiping of the water main, we also installed a new whole-house filter with a bypass, isolation ball valves, unions, and a drain to simplify filter changes. Additionally, we repiped approximately 50 feet of water piping in other parts of the basement to maximize the available space for the homeowners, reducing the amount of space that needs to be boxed out for the contractors