05/29/2026
School is officially out for SUMMER!
And if you want to put an end to the dreaded “I’m bored”, now is the perfect time to start building your custom dream pool.
With our current 8 to 10 week build timeline, you can still have your new pool and spa ready before sweet summertime ends.
Our $87,999 Summer Relaxation Package is available right now.
Tap the link to see the full package and lock in your summer build dates.
https://ss-pools.com/summer-special-relaxation-package/