08/05/2026
Roughing in a new bathroom — full plumbing renovation in progress. All new PVC drain lines installed, abandoning the old cast iron. Key highlights: two-way cleanout T for sewer access, new 2-inch PVC shower trap tunneled beneath the existing shower, properly vented toilet line to ensure optimal flow and prevent gurgling, and eighth bends used throughout for smoother drainage. Test ball in place for pressure testing. Quality work from the ground up. 🔧