08/04/2026
Working hard on our current repair! We’re replacing an entire system due to age and damage, the tank was old and brittle, with cracks throughout, and drain field was at capacity. New plastic primary tank and a fiberglass ATU tank were installed, both tanks with risers and dome lids to finish grade. The new drain field is a conventional system with 4” corrugated plastic perforated pipes that are embedded into to distribute effluent throughout the entire drainfield. This property is also prone to seasonal groundwater so we installed a curtain drain on the high side of the Drainfield to direct it around both sides and prevent potential from entering. After final grade we spread seed, fertilizer, and wheat straw to prevent This is a very time critical job in order to keep the system running for the homeowners the entire time but we did it with minimal down time✅ Give Foy Septic a call if you have a failing septic system and we will be happy to come take a look at it!