Hofmann Investments, LLC modern wood & steel construction services

Call Directions Website Contact the business

Hofmann Investments, LLC modern wood & steel construction services Hofmann Investments is a full service of wood & steel fabrication and erection company. Are you an inventor or artist? civil engineering

Hofmann Investments provides detailing, design of steel, aluminum stainless steel art work sculptures, we do fabrication and erection engineering consulting services We are specialized in fabrication & welding of any metal project in stainless steel, mild steel, Aluminum. CNC-Plasma services, punching, bending and fabrication of special parts modern design, art deco, art Sculptures, and crafts. Fabrication of Screens, Staircases, Fences, Gates, Railings, Louvers and more. We Hofmann Investments LLC bring your imagination to life.

11/19/2026

The new Florida Building Code takes effect December 31, and one section lands straight on the metal scope.

New Section 1711 requires corrosion-resistant fasteners, connectors and plates within 3,000 feet of a saltwater coastline. Inside 300 feet and exposed, fasteners have to be stainless. From 300 feet out to 3,000 feet it is stainless or enhanced galvanizing, depending on how exposed the assembly is. What is covered is the hardware that ties the metal to the structure: anchors, bolts, lag screws, clips, straps and plates.

For Broward, Miami-Dade and Palm Beach, that reaches a lot of the work we all have on the boards. And it is the kind of requirement that turns into a substitution request in the field when nobody priced it at buyout.

Three things worth doing now.

Check the distance from the coastline, not the distance to the water view. The 3,000-foot band is wide enough to catch plenty of buildings that do not feel coastal.

Confirm which edition governs the permit. Applications first submitted on or after December 31 fall under the new code. Miami-Dade RER has said portal submissions after 4 p.m. on December 30 will be reviewed under the 2026 edition, so on a project that is close, the filing date is the whole ballgame.

Price the finish, not just the part. Stainless and enhanced galvanized hardware costs more and takes longer to source. Better in the quote than in a change order three months in.

We are quoting coastal miscellaneous metals to the new section now, and glad to walk through what it means for a specific job.

Which hardware specs are you already seeing called out on drawings?

11/16/2026

"Who buys the steel" is a question worth asking before award, not after the mill call.

There are two ways a steel package gets bought. Fabricator-furnished: one contract, one price, and one party responsible for the mill rolling, the delivery window and whatever the market does between award and fabrication. Owner-furnished: the owner buys the material, usually to save the markup, and takes the price risk with it.

In a flat market the difference is mostly paperwork. This is not a flat market. AGC reported last week that prices for construction inputs are up 13.3% year over year, steel mill products are up 32.9% and aluminum mill shapes up 23.3%, and lead times for structural steel are getting longer. Fabricators are being asked to hold prices on 12-month blanket orders, which means somebody in the chain is absorbing risk they can't control.

Three things worth writing into the contract, whichever way it is split:

1. The material portion gets its own price mechanism. Separate material from fabrication, and let the material side adjust against a stated index in both directions.

2. Delivery and storage have a named owner. If the material is owner-furnished, say who holds the release dates, who pays for storage, and who eats the damage claim.

3. Shop drawing approval stays on the critical path. Procurement cannot start until drawings are approved, so a late approval is late steel no matter who signed the mill order.

We quote both ways and we will tell you which one fits the job. Either way, we want the escalation terms settled at buyout, not discovered at the first mill increase.

Which way are you buying steel on your next project, furnished or owner-supplied?

11/14/2026

Two of South Florida's biggest permits this fall were apartment projects: 728 units in North Miami Beach and 544 in Edgewater.

On a job that size, the metal package is enormous. Balcony guardrails on every floor, stair rails, amenity deck railings, plus trash enclosures, screening and roof rails. Thousands of linear feet of miscellaneous metals, and it usually gets priced late.

That's where these packages go sideways. The railing number comes back as one lump, it gets value-engineered, and the details that were never priced show up after award, when they cost real money.

Three things that keep it clean:

Get the fabricator into the drawings before CDs are finished. Guardrail heights, connection details, embed locations and finish specs all interact with structure, waterproofing and the architect's intent. Every one of those moves is cheaper to catch on paper.

Ask for a line-item budget, not a single number. Material by system type, labor by install condition, finish, alternates. A breakdown is the only number that holds from budget through buyout.

Consolidate what shares material and finish. Guardrails, handrails, screens, canopies and enclosures can be one package with one finish spec, instead of three subs handing off to each other.

If a 500 unit job is moving through your preconstruction queue, we would rather see the drawings early than perfect. An early set is still enough to get you a useful number.

What's the first misc metals scope you price on a multifamily job?

11/12/2026

Steel gets the headlines, but the rest of the metals package is moving too.

Border States' November commodity update puts the past year in hard numbers: copper up 35%, steel up 31%, aluminum up 9%, with steel suppliers opening November with another round of 5-10% increases. The same forces driving it, data center buildouts soaking up manufacturing capacity and 50% tariffs on imported steel and aluminum, don't stop at structural steel.

That matters for the miscellaneous metals scope that often gets priced last: railings, gates, brackets, embeds, fasteners, and hardware. Copper and aluminum inputs touch all of it, and data center demand is stretching lead times for conduit, pipe, and enclosures well beyond normal. A package quoted in September can be quietly stale by the time it's signed.

Three things worth doing on the next takeoff:

1. Get the full scope priced early, including the miscellaneous metals line items, not just the structural steel.
2. Ask for time-limited quotes with an escalation path, so a January price move doesn't land entirely on one side of the contract.
3. Flag long-lead hardware and fasteners now, since those are the items that stop er****on when they arrive late.

We build orders so the whole package, structure and miscellaneous metals alike, holds together when pricing moves. Are you seeing cost movement on the non-steel items in your scopes yet?

11/10/2026

More framing is leaving the jobsite and showing up as finished panels, and two pressures are behind it.

Trade coverage this month points to cold-formed steel framing moving toward prefabrication and panelization, and the reasons line up with what GCs and developers are dealing with right now:

1. Insurance. Noncombustible steel framing can qualify for meaningfully lower builder's risk and property premiums than combustible materials. On multi-story residential work, that difference alone can move a pro forma.

2. Labor. Cutting, layout, and assembly move from the jobsite into a controlled shop environment. Smaller field crews install coordinated panels faster, with less rework and more predictable schedules.

Where it fits: CFS handles bearing walls, floor joists, and interior framing on mid-rise and commercial work, while structural steel carries the long spans and heavy loads. On most projects they are not competitors, they are teammates on the same drawings.

The takeaway for anyone buying a steel package: ask early where panelized CFS can take scope off the critical path, and where hot-rolled steel still belongs. The earlier that split is made in design, the more both systems save you.

Are you seeing more panelized framing packages on your projects lately?

11/07/2026

FABTECH just wrapped in Las Vegas, and the theme across the show floor was clear: AI is moving into the fabrication shop.

More than 32,500 people attended, a record for a show held outside Chicago. Two things stood out for anyone buying steel packages:

1. AI is working its way into every step. Estimating tools that turn drawings into fabrication-ready models. Nesting software that optimizes the whole production flow, not just material yield. Camera-based weld inspection that checks welds against requirements in real time.

2. Welding cobots are going mainstream. ESAB unveiled a welding cobot that uses cameras and lasers to generate its own weld paths and adapt to changing joints in real time, no manual programming needed. Cobots are moving beyond long production runs into short-run, high-mix work, set up from a tablet instead of a robotics degree.

Why this matters to you: shops that invest in this technology can hold schedules tighter, catch problems at the weld, and keep skilled welders on the work that actually needs them. When you evaluate a fabricator, the technology on their shop floor is becoming part of the quality story.

We keep a close eye on this space so the work we deliver benefits from what's proven, not just what's new.

Are you seeing fabrication partners talk more about automation and AI in their shops?

11/06/2026

The best railing on a waterfront home is the one you barely notice.

That's the direction railing design has taken this year: homeowners want the view, not a fence in front of it. Frameless glass and thin cable systems are leading the way, especially on decks and balconies where the water is the whole point.

Two options are dominating:

Frameless glass. Panels set in a low base-shoe channel instead of heavy posts, so the panorama stays uninterrupted. It's the closest you can get to no railing at all.

Cable railing. Thin horizontal stainless cables that almost disappear against the horizon. Clean, industrial look, and it holds up well in coastal air when you use marine-grade 316L stainless.

Whatever the system, the material is what decides whether it still looks good in five years. Salt air is hard on hardware, so marine-grade stainless and powder-coated aluminum are the low-maintenance choices for South Florida homes.

Two things worth deciding early:

1. The mounting style changes the structure. A base-shoe channel and cable posts load the deck or slab differently than traditional posts, so it's much easier to plan for during design than to retrofit later.

2. Guardrail requirements still apply. Height, openings, and load ratings don't relax just because the railing is barely there. A good fabricator designs the slim look within code, not around it.

We fabricate railings that keep the view front and center and stay maintenance-light in coastal conditions.

Are you seeing more clients ask for railings that practically disappear?

11/03/2026

A signed steel order used to mean the material was yours. These days, that's not always the case.

Mills are cutting back orders they've already accepted. Recent industry reporting describes firm orders being reduced by as much as 75% with no confirmed new delivery date, mill allocations going out on top of that, and lead times for large fabricated orders stretching to 46-52 weeks. Pricing has also moved, with increases of $600-$700 per ton reported earlier this fall.

So the real risk right now isn't just the price of steel. It's a package you thought was locked in quietly shrinking underneath you.

A few things worth doing on any project with steel already in progress:

1. Get written confirmation from your fabricator on tonnage reserved and delivery dates, not a verbal "it's handled."
2. Ask what happens if the mill reduces the order: is there an escalation or re-order clause that protects the schedule?
3. Check that the small stuff is actually reserved too. Base plates, connection material, and embeds are often the pieces that slip when a mill cuts an allocation, and they're what stops er****on cold.

We watch this on every package we run, and we build orders so a mid-project cut doesn't stall your job. If you have steel in fabrication right now, it's worth a quick check on where your material actually sits.

Has anyone had an order trimmed after it was placed? What did that do to your schedule?

11/02/2026

The right railing, gate, or fence can completely change the look of your home. It adds curb appeal, improves everyday function, and can help increase your property’s value.

At Hofmann Investments LLC, we do more than structural steel. We also create custom residential metalwork designed to fit your home and your style: from clean, modern railings to durable gates and custom fence work.

Every project is handled with surgical-steel precision: careful measurements, clean fabrication, and workmanship built to last.

Thinking about upgrading your home’s exterior? Let’s talk about your project.

10/31/2026

A new steel spec is on the way, and one change in it is worth flagging now.

AISC's next structural steel specification, AISC 360-27, just finished its public review period (comments closed October 26) and is now going through committee review. The draft introduces a new connection category called "strain sensitive details": heavy welded joints in tension where a cope, access hole, or discontinuous member interrupts the section between intersecting complete joint pe*******on welds.

If that describes connections on your project, the draft carries extra requirements for material toughness testing, fabrication procedures, and post-er****on inspection. It reaches past the shop drawing into procurement and the inspection program, which is exactly the kind of requirement that gets expensive when it's discovered late.

Three things worth doing before the final version lands:

1. Have your engineer flag any heavy welded tension joints with copes or access holes on current and upcoming projects.
2. Check whether your contract documents and inspection scope would pick up the added testing if the requirement applies.
3. Make sure your fabricator sees the detail category early, not at submittal.

We follow these changes so our clients don't get surprised by them. When the spec is finalized, we'll adjust our detailing and shop procedures to match.

Has your team started looking at the AISC 360-27 draft?

Address

5320 Unit #5 And 5420 Unit 10&11 W State Road 84 And Reese Road
Davie, FL
33314

Opening Hours

Monday 6am - 3:30pm
Tuesday 6am - 3:30pm
Wednesday 6am - 3:30pm
Thursday 6am - 3:30pm
Friday 6am - 3:30pm

Telephone

9543479465

Alerts

Be the first to know and let us send you an email when Hofmann Investments, LLC modern wood & steel construction services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Hofmann Investments, LLC modern wood & steel construction services:

Shortcuts

Share

Nearby cleaning services