Last week, our team installed risers and serviced a septic tank located beneath an asphalt driveway. This tank had never been serviced before!
We started by locating the tank with our locating equipment, then carefully excavated the area to expose it. After installing the risers, we used 1¼-inch process stone to bring the grade up to subgrade for paving. We then compacted the area to help prevent future settling before repaving the disturbed section of the driveway.
We take pride in doing the job right from start to finish, leaving the area looking like we were never there!