09/11/2026
17,000+ gallons of water lost from a pipe break under the driveway!
The main service line was a mix of 3/4” polybutylene and PVC piping and had full separation.
The customer opted for a replacement. The line was upgraded to 1” and sleeved with 1 1/4” PVC pipe under the driveway and walk way to help prevent possible future damages to the pipe. Hydro cement was used to seal up the pe*******on points on the foundation wall. Water fully restored!