09/05/2026
For this job we demolition all old mosaic top copings and replaced with black granite top non-slip!! Perfect level on all side so the water overflow evenly out into the channel. This client also asked us to construct an outdoor shower too for the renovation. This job was located in Pong. 👍🏼 #สระว่ายน้ำ #ดูแลสระว่ายน้ำพัทยา