30/10/2026
𝗡𝗢𝗧𝗜𝗖𝗘 𝗢𝗙 𝗦𝗖𝗛𝗘𝗗𝗨𝗟𝗘𝗗 𝗣𝗢𝗪𝗘𝗥 𝗜𝗡𝗧𝗘𝗥𝗥𝗨𝗣𝗧𝗜𝗢𝗡
🗓️ 𝗢𝗖𝗧𝗢𝗕𝗘𝗥 𝟯𝟭, 𝟮𝟬𝟮𝟲 (𝗦𝗔𝗧𝗨𝗥𝗗𝗔𝗬)
🕗 𝟴:𝟬𝟬 𝗔.𝗠. – 𝟯:𝟬𝟬 𝗣.𝗠. (𝟳 𝗛𝗢𝗨𝗥𝗦)
🚧 𝗥𝗘𝗔𝗦𝗢𝗡:
To conduct midpole installation and relocation of 3-phase primary backbone pole that obstructs ongoing construction at Polo Maestra Bita, Oton.
📍 𝗔𝗙𝗙𝗘𝗖𝗧𝗘𝗗 𝗔𝗥𝗘𝗔:
𝗣𝗢𝗥𝗧𝗜𝗢𝗡 𝗢𝗙 𝗢𝗧𝗢𝗡
1. Abilay Norte
2. Abilay Sur
3. Bita Norte
4. Bita Sur
5. Portion of Buray
6. Cabolo-an Norte
7. Cabolo-an Sur
8. Cagbang
9. Lambuyao
10. Mambog
11. Pakiad
12. Polo Maestra Bita
13. San Antonio
14. San Nicolas
15. Tagbac Norte
16. Tagbac Sur
17. Tuburan
18. Portion of Lumina Homes
We humbly ask for your understanding regarding this scheduled power interruption.
⚠️ Power may be restored earlier than the scheduled restoration time if work is completed ahead of schedule. Please consider all lines and electrical equipment energized at all times.
𝗖𝗰:
📻 DYOK – Aksyon Radyo
📻 DYFM – Bombo Radyo
📻 DYRI – RMN Iloilo
📻 DYIS – Radyo Kahilwayan Sta. Barbara