C & L 24hr Emergency Drainage Ltd

C & L 24hr Emergency Drainage Ltd If you have an emergency drainage problem, C & L 24hr Emergency Drainage Ltd are the team to call.

C & L 24hr Emergency Drainage, we carry out CCTV surveys, sewage treatment plant installations and maintenance, Septic tank emptying, Root removal, Pipe patch repairs and drain unblocking. We cover most areas within a 60 mile radius and will have a team to you ASAP.

We're proud to share that our office manager Linzi is running Edinburgh marathon on the 25th May 2025 for an incredible ...
02/05/2025

We're proud to share that our office manager Linzi is running Edinburgh marathon on the 25th May 2025 for an incredible charity - The Vitiligo Society. The Vitiligo Society

As a company we have donated to support Linzi, and we are sure she will do amazing. If you would like to donate the JustGiving link is below:

Help Linzi Beedles raise money to support The Vitiligo Society

Called out to a blocked manhole on a driveway overflowing with sewage in Whitchurch. Jetting to clear the blockage and a...
28/04/2025

Called out to a blocked manhole on a driveway overflowing with sewage in Whitchurch. Jetting to clear the blockage and a cleanup afterwards all left free flowing and clean within the hour πŸ‘πŸ»πŸ’©

A recent patch lining repair job completed in condover installing 4 patched. First cctv’d pipework showing cracks and ro...
03/03/2025

A recent patch lining repair job completed in condover installing 4 patched. First cctv’d pipework showing cracks and root ingress, cut roots and then patched to cure the problems πŸ‘πŸ»

Root removal at an industrial property in Newtown. First attended 2 blocks of blocked toilets. Further investigation sho...
20/02/2025

Root removal at an industrial property in Newtown. First attended 2 blocks of blocked toilets. Further investigation showed root ingress in the drain lines. Re-attended site to cut out and remove leaving the toilets all free flowing πŸ’©πŸ’©
πŸ“ž:01938 228 297
πŸ“§:[email protected]

A few of the jobs completed over the last month. CCTV surveys carried out in Condover and Mould. Attended a re-occurring...
14/02/2025

A few of the jobs completed over the last month. CCTV surveys carried out in Condover and Mould. Attended a re-occurring blockage in Telford, we removed a whole bucket of limescale from a 6 metre line which was causing the blockage. And a sewage treatment plant de-sludge and service in ShrewsburyπŸ’©.
If you require any of our services:
πŸ“ž:01938 228297
πŸ“§: [email protected]

We are looking for an experienced groundworker to join our team for an immediate startCSCS card preferred but not requir...
24/01/2025

We are looking for an experienced groundworker to join our team for an immediate start

CSCS card preferred but not required

Pay is dependent on experience

Driving licence required

Please contact [email protected] if you are interested or call 01938 228297

Merry Christmas from all the team at C and L Drainage. Thank you to all customers new and old for a good year πŸŽ…πŸ’©
24/12/2024

Merry Christmas from all the team at C and L Drainage. Thank you to all customers new and old for a good year πŸŽ…πŸ’©

Install of a Tricel novo 6pe pumped in Oswestry πŸ˜„
14/08/2024

Install of a Tricel novo 6pe pumped in Oswestry πŸ˜„

19/04/2024

Kingspan Klargester Bio disk restart in the Shrewsbury area.

All up and running πŸ˜πŸ‘Œ

Kingspan Klargester Bio disc restart in the Shrewsbury area. This bio disc was not emptied or maintained for a number of...
18/04/2024

Kingspan Klargester Bio disc restart in the Shrewsbury area.

This bio disc was not emptied or maintained for a number of years. The disks were broken and the bio zone area was dead. The belt was worn out, the bottom and top clog were rusted to the center pole.

C & L drainage completely emptied the tank of foul waste with the tanker, removed the motor, cut out the bio discs then completely jet washed the inside of the tank.

We installed all new moving parts inside of the tank. This include brand new bio discs, new bottom and top clog, new drive belt and new half and full nylon bearings.

We refilled the bio disc with clean water and then commissioned the new treatment plant. πŸ‘Œ

This style of sewage treatment plant is the oldest but one of the best in our opinion.

Video to follow of it all up and running πŸ˜„

Tricel Novo 6pe pumped install
27/03/2024

Tricel Novo 6pe pumped install

25/03/2024

Address

Unit 1 The Quarry, Brook Street
Welshpool
SY217NA

Alerts

Be the first to know and let us send you an email when C & L 24hr Emergency Drainage Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to C & L 24hr Emergency Drainage Ltd:

Share