We Fix Drains

We Fix Drains We Fix Drains covers Wiltshire, Dorset and Somerset. Fixed Fees and no hidden costs.

We offer Drainage solutions, Sewer Clearance, CCTV surveys, Drainage installations, Drain unblocking a 24hr service and much more.

Another day another water leak. This split on a 100mm water main moving water from one reservoir to another one. The gro...
21/01/2026

Another day another water leak. This split on a 100mm water main moving water from one reservoir to another one. The ground lifting made this easy to find!

We have been back to visit the commercial sewage treatment plant we installed last year to carry out maintenance and ser...
16/01/2026

We have been back to visit the commercial sewage treatment plant we installed last year to carry out maintenance and servicing this week. Within this system you have 16 air pumps, 96 air diffusers, 6 pumps and 9 float switches. If you are looking for servicing of your sewage treatment plant. Give us a call on 01747 859203

Another septic tank upgraded to a new sewage treatment plant and drainage field. The system has been installed in a fiel...
05/11/2025

Another septic tank upgraded to a new sewage treatment plant and drainage field. The system has been installed in a field due to an easement with a local landowner. We have fenced this off with 4 strands of barb wire to stop any livestock getting too close for comfort.

We have just completed another sewage treatment plant. This was an upgrade from a septic tank and soakaway. The last of ...
29/09/2025

We have just completed another sewage treatment plant. This was an upgrade from a septic tank and soakaway. The last of the turf due to go down this week and job done.

Yesterday evening we were called to a dairy farm for a blocked 225mm slurry main. We used our high pressure water jet to...
18/09/2025

Yesterday evening we were called to a dairy farm for a blocked 225mm slurry main. We used our high pressure water jet to clear the blockage and flushed the line out after.

Here is a sewage treatment plant and new drainage field installation in East Melbury, Shaftesbury we have just completed...
17/06/2025

Here is a sewage treatment plant and new drainage field installation in East Melbury, Shaftesbury we have just completed. The access was tight getting the machine in and out and due to space we have worked with Dorset council building control to come up with the best solution. We have installed a Tricel UK6 sewage treatment plant. Whilst on site we have put a new fence up and created a hardstanding ready for a patio to be laid later in the year. Another tidy finish from our engineers! Thanks to our lovely customers and to Sherborne Turf for the instant lawn!

18/02/2025

WE ARE SEEKING SOMEONE TO JOIN OUR EXPANDING DRAINAGE AND GROUNDWORKS TEAM. WORKING ALONGSIDE OUR DRAINAGE TEAMS ON A SELF EMPLOYED BASIS PART OF THE CIS SCHEME.

ROLE TO INCLUDE – INSTALLING SEWAGE TREATMENT PLANTS AND SEPTIC TANKS, PIPE LAYING, INSTALLATION OF WATER PIPES AND REPAIRS, RESIN LINING. THIS ROLE DOES INCLUDE WORKING WITH LIVE SEWAGE.
IDEAL CANDIDATES TO HAVE SOME KNOWLEDGE ON GROUNDWORKS AND DRAINAGE. TRAINING WILL BE PROVIDED. MUST BE RELIABLE, HARDWORKING, HAVE GOOD TIME KEEPING AND GOOD CUSTOMER SERVICE IS KEY. A DRIVING LICENCE IS A MUST.

CONTACT US ON FACEBOOK OR EMAIL US ON
[email protected]

We have had a busy start to the year installing this new BioKube commercial sewage treatment plant. The system has repla...
26/01/2025

We have had a busy start to the year installing this new BioKube commercial sewage treatment plant. The system has replaced a steel Bio Plus system which had started to rust in places. The reason the BioKube system has been chosen is because of its advance technology to manage the flow and treatment process from high and low usage. The clients have also increased the size of the sewage treatment plant to allow for further development on the holiday park in the near future. We have a new fence and walkway to install and this job will be completed then on to the next one.

The last 2 days we have been taking deliveries of this commercial sewage treatment plant ready to start in January after...
06/12/2024

The last 2 days we have been taking deliveries of this commercial sewage treatment plant ready to start in January after carrying out the groundwork’s back in October.

The tank consists of…

3 x Holding tanks 8.1m x 2.4m
4 x Jupiter 100 series ( Treatment units ) 5.5m x 2.1m
1 x Buffer tank 6.1m x 2m

This sewage system has been built and supplied by Tricel Environmental UK the process has been simple and effective.

Thanks to Dorset Hire Services Ltd for sorting out the Telehandler.

We have just finished a 138m x 5m wide 200mm deep structural fibre concrete road. This was part of the countryside stewa...
05/11/2024

We have just finished a 138m x 5m wide 200mm deep structural fibre concrete road. This was part of the countryside stewardship grant RP15 for one of our private estate customers. We installed 88 kerbs with 10 weir kerbs for drainage into a new 150mm clean stone drain behind the kerbs. The weather made this challenging but a great result but the team

We were invited up to Lye Head by a manufacturer that recommended us to start a project which will run into 2025. This i...
04/11/2024

We were invited up to Lye Head by a manufacturer that recommended us to start a project which will run into 2025. This is to install an above ground sewage treatment plant for over a 1000 people on a holiday park. We have completed the first phase of the job to install a new 200mm reinforced concrete slab.

05/09/2024

We attended another dairy farm with a blocked 300mm drain from the milking parlour. The pipe was 100 metres and blocked with slurry but another job done on a typical English rainy day.

Address

Mere
Warminster
BA12

Alerts

Be the first to know and let us send you an email when We Fix Drains posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to We Fix Drains:

Share

Category