08/06/2025
An end of summer decommission , starting of by giving the pool a clean to remove any leafs or dirt , we then add our chemicals to hopefully prevent the pool from going green over the winter months . After that we got the winter cover out and fitted it over the pool while we wait for the chemicals to circulate so they dont just sit at the bottom which could lead to faded liner .10-15 mins later after being left to circulate we put bottles back in half filled of water so that if there was a freeze the pressure of the frozen pool water wont be pushing out on the pool structure , then lastly we disconnect the pipework in the plant room and drain any water still in the system again to prevent frozen water in the pipe that could lead to cracks in the pipework .