16/10/2026
Emergency works were carried out following flooding in the rear storage area. The drainage system was drained down, and a section of drainage pipe was removed to access and clear debris and a bottle lodged inside the pipework. A new section of pipe was installed, and the system was fully tested upon completion to ensure it was functioning correctly.