07/08/2026
π₯ Watch the final obstruction being removed from this 225mm concrete stormwater line.
We were instructed by our client to carry out drainage works on a 225mm concrete stormwater line that was approximately 90% blocked by tree roots, preventing rainwater from flowing away effectively.
Our team has been carrying out mechanical root cutting, high-pressure water jetting and CCTV surveys to restore the line and prepare it for a full drain reline.
This video captures the moment the final root mass, along with a large piece of wood, was successfully removed from the last section of the pipeline, leaving it clear and ready for the next stage of the project.
Another great result and a perfect example of how the right equipment and expertise can restore heavily obstructed drainage systems before rehabilitation.