14/09/2026
A re painting of the lettering on a stone which had faded and a complete NAMM refix of a stone that had failed a council stability test. The old foundation was removed and replaced with a new larger NAMM approved concrete foundation and steel ground anchor which was drilled into the base and pushed into the ground 18 inches below. Please get in touch if you have any repair work of stones, cleaning, re lettering or new Memorials on 07949 013247 or email [email protected]