17/01/2025
Not a bad couple of days surveying
1146m total across 150mm - 750mm pipework
The crawler system makes surveying on busy building sites breeze, as we can survey multiple runs from a manhole out of the way of other traffic, only needing to lift covers briefly to get depths and occasionally reposition the tractor unit
This massively reduces down time for us and other trades onsite.
If we can assist with any of your drainage needs get in contact by
Email ✉️ [email protected]
Phone 📱 01634670396