10/26/2025
We recently completed a full Poly-B to
PEX repipe for one of our clients.
We upgraded the manifold piped from 3/4” to 1” so that they’re no water pressure loss during high demand times and added ball valves on every outlet for ease of maintenance. They wanted a few upgrades while we were at it, a recirculating line for the master ensuite shower, a flood-protection device to notify them of any possible future leaks, a water softener loop and a shower valve replacement.
The result? Smooth water pressure, faster hot water, and one very happy homeowner!
If you're thinking about replacing your old Poly-B piping, don't hesitate to reach out. We offer free estimates and take pride in doing the job right the first time.
Ewert Plumbing Services Ltd.
250-533-1151