03/05/2026
Photo Credit:Get rid of it Store ๐ธ
March 1 2026 4 Wing Cold Lake Air Base
The Base Skyline is changing before our very eyes ๐ ๐
Lots Happening ๐ธ
Wondering where the 200+ Housing Buildings will go?
4 Wing Cold Lake is undergoing massive infrastructure upgrades totaling nearly $1 billion to prepare for the arrival of F-35A fighter jets and support NORAD missions. Major projects include constructing a 10,000-square-meter Quick Reaction Alert (QRA) facility, new hangars, and upgraded support infrastructure. These developments are transforming the base into a modern, long-term operating base for the Royal Canadian Air Force, with construction projects ongoing through 2026-2027.