19/06/2022
Another Termite Treatment carried out during the week
A full termite inspection was carried out and the first course of pavers against the house were removed so that a more thorough Termite Barrier could be carried out to the perimeter of the house.
This treatment is more thorough than Companies that drill through the pavers or drill the edge of the pavers then do the treatment.