04/06/2021
Busy day knocking out a bunch of tasks for a customer
- 3 drain plugs repaired
- shower fixtures repaired
- 2 screen doors placed on tracks and greased
- New sliding glass door handle and lock
- new bathroom door
- patched, textured, and painted two holes
-replaced water damaged base board
-replace corner tile piece on counter
- installed a hinge door stop
- cleaned out gutters around the entire house