06/06/2026
Finally got our 10ft Hastings poly delivered Saturday afternoon. So 1st step was to remove the grass, bring in sand & then level the best we could. Got some rain in the process & with heat index at 104 it was a hot steamy mess. Step 2, my husband cleaned it good before placing on the sand. Then we covered until we can get all necessary parts, etc. Step 3, Electrical done, pump set & ready to go. Sweat our rear ends off placing the landscape fabric, then trim, blocks & river rock. Put the spa benches together. I had to order the correct size hole saw & hopefully it will be here tomorrow. So ready to get water in it!! We also want to put up a shade sail eventually & add other stuff as we go. It doesnβt get any shade until the latter part of afternoon. π₯΅