Volmer Construction

Volmer Construction Family owned business specializing in concrete, residential framing,drywall, metal buildings and more

Wrapped up the exterior portion and liner panel package of this 80’x130’ metal building a few weeks ago. Sheetrock is hu...
03/26/2026

Wrapped up the exterior portion and liner panel package of this 80’x130’ metal building a few weeks ago. Sheetrock is hung and finished in the office space. Paint and drop ceilings next week.

6-8’ of mud coming out of this pond. Give us a call for any dirt work needs
03/14/2026

6-8’ of mud coming out of this pond.
Give us a call for any dirt work needs

Concrete phase is completed on this project660’ of 2’x16” footings80’x120’x 6” slab on grade80’x10’ porch4- 20’x11’ appr...
02/03/2026

Concrete phase is completed on this project
660’ of 2’x16” footings
80’x120’x 6” slab on grade
80’x10’ porch
4- 20’x11’ approaches
308 cubic yards
8 ton of 1/2” rebar 18” o.c.

Red iron is going up now

40’x60’x12’ red iron we build a few months ago. Burnished slate roof, wainscote and trim. Desert sand walls. 5” of spray...
12/29/2025

40’x60’x12’ red iron we build a few months ago.
Burnished slate roof, wainscote and trim.
Desert sand walls.
5” of spray foam insulation

Subcontractors are almost finished and ready for sheetrock in the living quarters.

Our team supplied a 56' x 75' x 8' red iron structure set on a 4' stemwall, with a 40' x 50' section featuring full insu...
12/19/2025

Our team supplied a 56' x 75' x 8' red iron structure set on a 4' stemwall, with a 40' x 50' section featuring full insulation and a liner panel package. The building includes four 12' x 10' overhead doors.
Parsons,Ks

We're grateful for the repeat business.

This 20’x80’ red iron has served its purpose over the years and was ready to come down. Making room for a foundation exp...
08/23/2025

This 20’x80’ red iron has served its purpose over the years and was ready to come down. Making room for a foundation expansion and a new red iron building

Exterior is wrapped up other than stone work around the front door and post wraps. Start mudding and taping sheetrock Mo...
07/03/2025

Exterior is wrapped up other than stone work around the front door and post wraps.

Start mudding and taping sheetrock Monday

30’x40’x12’ shop with two 20’x40’ lean-to’s 3/12 and 1.5/12 pitchRustic red wall panelsWhite trimBurnished slate roofSt....
06/29/2025

30’x40’x12’ shop with two 20’x40’ lean-to’s
3/12 and 1.5/12 pitch
Rustic red wall panels
White trim
Burnished slate roof
St. Paul, Ks

Exterior rough-in phase is complete. Interior rough-in is started. Wood porch ceilings up next. Oswego,ks
04/25/2025

Exterior rough-in phase is complete. Interior rough-in is started. Wood porch ceilings up next. Oswego,ks

Quick little foundation for a 40’x70’ done early this week. 140’ of footings,1200 sqft of slab on grade, 8 piers and 40’...
04/18/2025

Quick little foundation for a 40’x70’ done early this week. 140’ of footings,1200 sqft of slab on grade, 8 piers and 40’x5’ sidewalk

Concrete phase finished on this project last week.1775 sqft broom finished patiosDimond cut784 sqft garage floorOswego,K...
03/09/2025

Concrete phase finished on this project last week.

1775 sqft broom finished patios
Dimond cut

784 sqft garage floor

Oswego,KS

60’x100’x16’ red iron 2/12 pitch roof2-20’x14’ shop doors1- 12’x12’ shop door2- 3070 walk doors5- 4040 windowsCrimson re...
01/05/2025

60’x100’x16’ red iron
2/12 pitch roof
2-20’x14’ shop doors
1- 12’x12’ shop door
2- 3070 walk doors
5- 4040 windows
Crimson red walls
Bright white trim
Galvalume roof

Spray foam going in next week
Concrete approach’s will be poured this spring

Address

1531 21, 000 Road
Parsons, KS
67357

Telephone

(620) 778-3424

Website

Alerts

Be the first to know and let us send you an email when Volmer Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share