04/03/2026
๐๐๐๐๐๐๐๐ ๐๐๐๐
๐๐๐๐ ๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐
This workscope was carried out over two full days, with all moss carefully removed from the roof areas before a full treatment of HSE approved biocide was applied to the roof tiles
While on site, we also replaced the dry ridge end cap on the rear dormer window after it had come loose during recent weather.
The replacement supplied was slightly different in style, so to ensure a consistent finish we installed a matching pair.
Attention to detail is important, and we always aim to leave everything looking right.
In addition, the ACO drain was fully cleared out as it was heavily blocked with leaves and debris, allowing it to flow freely again.
The customer was delighted with the overall result and the fresh appearance of the property.
Press the ๐ช๐ต๐ฎ๐๐๐๐ฝ๐ฝ button for a free and easy same day quote
๐๐ข๐ ๐ก๐ฅ๐๐ง๐ ๐๐ฒ๐๐ซ๐จ๐๐ฅ๐๐ฌ๐ญ
๐ญ๐๐๐๐๐ ๐ถ๐๐๐๐
โฆ๐ณ๐๐๐๐๐๐ ๐ป๐๐๐๐๐๐