05/11/2026
We framed this detached and addition then the winter was long and intense. We're back now.
Last week everything was insulated with a flash & batt (r12 sprayfoam + r14 rockwool). End of last week we boarded/taped + primed the floor + set the uncoupling membrane.
Today, we coated and pre-cut the floor: herringbone to match the kitchen we had previously done for cohesion into the new space. In-floor heat cable was run today and this will be a smooth install tomorrow after finish coat and second side angles are complete.
Then ready for paint, trim and millwork!