10/01/2026
🚨 FOR SALE: TURNKEY HIGH-END STUDIO – SOUTH LISMORE
As we approach transitioning to a new private space and taking another step back its time to put the Shine factory up for sale, its too good to decommission it id love to see it provide years of opportunity and income to the next Tennant, its been a fantastic studio for us for 6.5yrs and those who were here many years before us.
We inherited a bare shell and over 6yrs spent significant time and money enhancing the space and functionality.
Price: $15,000 + GST (FIRM)
Stop paying $600/wk for a bare shed. Secure this high-spec, 100sqm workshop with possibly the most affordable rent on the East Coast.
💰 THE FINANCIALS
Rent is currently $935/mth inc GST, im happy to work with new owner and real estate to try and secure this long term as its mutually beneficial. Shed is structurally sound and in a great location for operating a commercial business.
Stability: Multi-year ongoing leases for long-term security.
Profitability: This low baseline cost ensures solid margins from Day 1.
🌊 HISTORICALLY RESILIENT
Built above 100-year flood level.
Proven History: Historically dry in 1974 (12.1m) and 2017 (11.6m).
🛠️ THE SPEC SHEET (Included in Sale)
DA Approved: Skip the 12-month Council wait and significant cost; fully compliance-audited.
Lighting: 10x Narva color-matching lamps on purpose built lighting rigs + waterproof LED wall arrays for a true finish.
Industrial Air & Water: Commercial copper pipework, plumbed water to the door, and an extensive airline network.
Trade Waste: 500L high-capacity separator + industrial plunger pump with easy-rebuild gear set.
Security: B2B alarm with mobile monitoring + full CCTV coverage.
Tech: Active NBN, B2B Alarm, CCTV, multiple power clusters, and industrial wall fans.
Frontage: Professional concrete apron for dust-free vehicle access, we advocated for this for years.
✖️ not included in sale
Personal tools, Artwork and personal electronics, happy to negotiate on some items for the right buyer.
⚠️ THE 60-DAY EXIT
Priced for a clean, fast transition. If not sold by March 2026, the facility will be stripped back to a shell and the DA cancelled.