Construkt Building

Construkt Building At Construkt Building we specialize in :

- Renovations - Extensions
- Bathrooms - Kitchens
- Decks- Pergolas

Contact us for a free quote

Some before and after pictures really hit the spot 😍 This renovation in Richardson is one of them. We removed internal w...
29/05/2026

Some before and after pictures really hit the spot 😍 This renovation in Richardson is one of them. We removed internal walls to open up the new living space. Full renovation of living, dining, kitchen and laundry. Including new windows, all new sheeting, insulation, electrical, joinery and flooring. As always thanks to Stef’s Electrical and Lovett Plumbing.

Next slabs complete at our project in Gordon. Thanks to the crew at AP Concreting & Contracting πŸ‘Œ
22/05/2026

Next slabs complete at our project in Gordon. Thanks to the crew at AP Concreting & Contracting πŸ‘Œ

Update on or project in Gordon. - Existing house internals stripped out.- Garage base slab complete. Bricked up to next ...
03/05/2026

Update on or project in Gordon.

- Existing house internals stripped out.
- Garage base slab complete. Bricked up to next slab height with steel installed ready for bondek above. New area to be kitchen/ pantry and dining on suspended slab.
- Front and rear extension areas bricked up/ filled in ready for next slabs.

Once next slabs complete the whole roof structure comes off ready to be re framed/ new trusses to take its new shape.

New job underway in Gordon. Substantial extension and renovation to take full advantage of the views. Construction will ...
18/02/2026

New job underway in Gordon. Substantial extension and renovation to take full advantage of the views. Construction will take this dated 3 bedroom property to a modern 4 bedroom, study, 2.5 bathroom, 3.5 garage family home.

- Addition of 41m2 to garage area. Addition of 95m2 to living area. Giving a combined new total of 340m2.
- Full gut of existing house with new framework to suit layout.
- Complete re-roof including all new trusses to change shape of roof.
- Exterior finishes to consist of face brick, render and feature metal cladding.
- Complete start to finish job from planning to turn key.

This job will be full of challenges but we look forward to see it all come together.

Kambah extension nearing internal completion. Addition of rumpus room, master bedroom, ensuite and robe.
19/12/2025

Kambah extension nearing internal completion. Addition of rumpus room, master bedroom, ensuite and robe.

Slab complete for our new build in Chisholm. Thanks to the team at AP Concreting & Contracting πŸ‘Œ
03/12/2025

Slab complete for our new build in Chisholm. Thanks to the team at AP Concreting & Contracting πŸ‘Œ

New build underway in Chisholm. Total area of 207m2 to include 3 bedrooms, 2 bathrooms, study, under roofline double car...
05/11/2025

New build underway in Chisholm. Total area of 207m2 to include 3 bedrooms, 2 bathrooms, study, under roofline double carport and alfresco.

Project in Theodore complete and ready for handover. We took this 3 bedroom / 1 bathroom property and turned it into a 4...
12/09/2025

Project in Theodore complete and ready for handover. We took this 3 bedroom / 1 bathroom property and turned it into a 4 bedroom + study / 2 bathroom home.

- Extension of 59m2 included new large living/dining room, master bedroom, walk-in robe and ensuite. 2.7m ceilings to new areas.
- Renovation to existing property including full repaint, new flooring, new robes, new air-con system and new double glazed windows throughout.
- Merbau deck to rear connecting new areas to backyard.

As always clients were a pleasure to work for and we are sure they will love their new family home for years to come.

Update on our extension in Kambah.- Drains βœ”οΈ- Groundworks βœ”οΈ- Form / mesh and concrete slab βœ”οΈ- Frames βœ”οΈ- Roof structu...
07/06/2025

Update on our extension in Kambah.

- Drains βœ”οΈ
- Groundworks βœ”οΈ
- Form / mesh and concrete slab βœ”οΈ
- Frames βœ”οΈ
- Roof structure βœ”οΈ

Garage frames/ roof structure and framework for large rear deck / pergola to come. Then move forward to lockup stage.

05/06/2025

Busy few days at our Theodore extension. Lock up stage complete, ceilings battened, insulation and all sheeted.

Sneak peak of Theodore extension. Presheet and rough-ins complete, ready for insulation and sheeting next week.
31/05/2025

Sneak peak of Theodore extension. Presheet and rough-ins complete, ready for insulation and sheeting next week.