26/07/2026
Family Entertainer at Roseworthy
7x4m Malibu, build start to swim in 5 days.
Scope of work:
• 3 step Cascade entry
• 2 deep end corner swimouts
• Aqualux liner in Lindeman
• Mineral X low TDS filtration with pH doser
• 15kW inverter heat pump
• Bond beam ready for coping
Another great job from the lads at Adelaide Hybrid Pools 👏